Tuesday, July 27, 2010

Frame 8






Update time again.This is Frame 8 which every Spit lover will know as the one below the instrument panel.Actually the instrument panel sits back a bit from the aft edge of frame 8 by about 40mm.
The frame is in 4 main sections,port forward,port aft,starboard forward and starboard aft,These are joined together by buttstraps at the bottom and the compass mount plate at the top.Joining fwd to aft is by c channel brackets that radiate around the frame and by a coaming that wraps around the internal shape.At the top is a capping strip where the Blind Flying panel mounts bolt to.On the webs are the kigass primer,fuel tank selector and pulleys for the Uc locking cables.On the forward side up top is the bracket for the fuel tank bracing tubes.The compass bracket also bolts up and is offset to one side.Think this is to give a pilot a better look as the control column would block the view.At the bottom is the diaphragm attachments for the control column and rudderbar heel assembly.

Monday, June 7, 2010

Frame7



Next frame back is frame 7 which is the rearmost support for the bottom fuel tank.Virtually the same type of frame as per 6 but a bit deeper due to the drop in the fuselage profile.The top curve is exactly the same as frame 6 due to the mounting of said fuel tank.Also this is the start of the Spitfires cockpit as the diafragms for the rudderbar bracing start here.Just behind frame7 is the cockpit front fireproof bulkhead.A 3D design of the frame and placeholder bottom fuel tank to see if it here...all will fit.

Wednesday, May 19, 2010

frame 6


Working back is the start of the front fuel tank area.Here we have the first frame which is frame6.This is a web at the bottom along with hatsection side members that terminate at the datum longeron.The top curve of the web matches the profile of the bottom skin of the bottom fuel tank.Triangular gussets strengthen the web.

Friday, April 9, 2010

Anatomy of the Spitfire






Starting with Frame5 which is the Spitfires engine firewall assembly and wing front attachment point.The lower assembly is made up of a front and rear web,spaced out with aluminium spacers and C section brackets.On the front and back are the wing main spar attach spars.There are two upper and two lower spars.
Up the top is the engine firewall which is a sandwich of two thin sheets of .022" aluminium and a 3mm sheet of asbestos or fireproof board..Mounted to the firewall are the various parts and brackets like the hydraulic tank,filters and other fittings for the Merlin.

Tuesday, March 23, 2010

Winging it






One of the most amazing structures or frustrating is the Spitfires wing.A genius of his time,Mitchell created an engineering marvel.This is due to the complexities of it,s internal structure,from it,s D section leading edge to it,s different main spar fabrication.Today a man I think who is doing some marvelous work reverse engineering the wing is Justin Adams from Europe.Working off original drawings,especially the Supermarine drawing for the chord offsets and reverse engineering an original wing Justin is slowly creating a 3D model of the wing and it,s internals.He is using a design program called Rhino and here are some screenshots of his work so far..

Friday, March 19, 2010

Up the front...






Another set of WIP pics this time by a friend in Japan named Fumiyuki (Aka Shinpachi).He works in a brilliant 3D program called "Shade".This is to recreate a Rolls Royce Merlin for the project in different ways.all the work has been researched off various factory manuals,photos and some original drawings.Pics shown are the bottom end and some of the top end.

Tuesday, March 9, 2010

Start off.






Here is some beautiful Solidworks screenshots done by good friend Tony and his students at John Swett High School Cad Class at Crockett,California USA.
His work is a conjunction using the Morningford MkIX book and original Supermarine Drawings..